The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies. Every country, region and year the World Bank publishes for indicator IC.CNST.PRMT.DFRN.DB0615 (Doing Business), delivered as a tidy table — country, ISO code, year and value — ready for analysis in Excel, R, Python or the Intigal AI workspace.
First 0 rows, exactly as they appear in the file.
0 columns and 0 rows, with the detected type and missing-value count for each column.
| Column | Type | Missing values |
|---|
Version 1: Listed from the publisher's open-data release.
Original source: api.worldbank.org · CC BY 4.0 — free to reuse with attribution to the World Bank