Dataset library
housing$3 one-offhousingworld bankdoing businessic.cnst.prmt.tm.dy

Dealing with construction permits: Time (days) — every country, all years (World Bank)

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day. Every country, region and year the World Bank publishes for indicator IC.CNST.PRMT.TM.DY (Doing Business), delivered as a tidy table — country, ISO code, year and value — ready for analysis in Excel, R, Python or the Intigal AI workspace.

Rows
0
Columns
0
File size
prepared on demand
Source
World Bank Open Data

Preview

First 0 rows, exactly as they appear in the file.

Schema

0 columns and 0 rows, with the detected type and missing-value count for each column.

ColumnTypeMissing values

Source & licence

Source
World Bank Open Data
Extracted
10/17/2026, 1:31:35 PM
Detected format
text/csv

Version 1: Listed from the publisher's open-data release.

Original source: api.worldbank.org · CC BY 4.0 — free to reuse with attribution to the World Bank