Dataset library
transport$3 one-offtransportworld bankwdi database archivesic.imp.dursprivate sector

Time to import (days) — every country, all years (World Bank)

Time to import is the time necessary to comply with all procedures required to import goods. Time is recorded in calendar days. The time calculation for a procedure starts from the moment it is initiated and runs until it is completed. If a procedure can be accelerated for an additional cost, the fastest legal procedure is chosen. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing each remaining procedure without delay. Procedures that can be completed in parallel are measured as simultaneous. The waiting time between procedures--for example, during unloading of the cargo--is included in the measure. Every country, region and year the World Bank publishes for indicator IC.IMP.DURS (WDI Database Archives), delivered as a tidy table — country, ISO code, year and value — ready for analysis in Excel, R, Python or the Intigal AI workspace. Original compiler: World Bank, Doing Business project (http://www.doingbusiness.org/)..

Rows
0
Columns
0
File size
prepared on demand
Source
World Bank Open Data

Preview

First 0 rows, exactly as they appear in the file.

Schema

0 columns and 0 rows, with the detected type and missing-value count for each column.

ColumnTypeMissing values

Source & licence

Source
World Bank Open Data
Extracted
10/17/2026, 1:31:35 PM
Detected format
text/csv

Version 1: Listed from the publisher's open-data release.

Original source: api.worldbank.org · CC BY 4.0 — free to reuse with attribution to the World Bank